How renovation pricing is actually built up here, what separates two quotations that look far apart, and what to check before you sign.
Most people asking what a renovation costs in Dubai are really asking a different question: is the quote I have been given reasonable?
That question is answerable. The first one is not, at least not usefully, because the range across projects is too wide for an average to mean anything.
This page covers how renovation pricing is built up in Dubai, what separates quotations, and what to check before signing. For specifics, see the villa renovation cost and bathroom renovation cost guides.
There are only two kinds of quotation: a bill of quantities, and a number.
A bill of quantities breaks the work into items, with quantities, specified materials and rates. You can read it, question it, and set it against another contractor's. A single lump sum cannot be compared against anything, and it gives you no way to see what has been left out.
A BOQ worth having shows scope room by room, materials named by specification, quantities and rates, exclusions stated explicitly, provisional sums identified, approval responsibility, payment milestones tied to completed stages, and preliminaries: site setup, protection, supervision and waste removal.
Preliminaries are the line most people have never heard of and every contractor carries. It covers the cost of running the site rather than building anything. It is legitimate, and a quote with no preliminaries has either buried them elsewhere or forgotten them.
Yes, and they are the cost most often missing from a budget.
In an apartment, building management approval, contractor registration and a refundable deposit all apply before work starts, and a modification permit may be required depending on the tower. In a villa, structural work and extensions involve engineer's drawings, consultant fees and permit costs.
None of these is large against the build cost. The problem is discovering them after the budget is fixed. Ask which apply, who submits them and what they cost, at quotation stage.
From a site visit and an agreed scope. Anything else is a guess dressed as a quotation. What to ask for:
Programme affects cost, because time on site is a cost of its own.
Approvals come first and are the least predictable stage. After that, the sequence is broadly fixed: strip-out, civil, MEP first fix, waterproofing, screed, finishing, second fix, snagging, with joinery manufactured in parallel.
Curing periods, on plaster, screed, waterproofing and grout, cannot be compressed by adding labour. A programme that ignores them produces finishes that fail.
A quotation with no preliminaries has either buried them in the rates or forgotten them.
Tell us the property type, the area and what you want changed. We will visit, confirm which approvals apply, and issue a bill of quantities with materials, exclusions and provisional sums stated.