Porcelain, marble, engineered wood and vinyl — laid on properly prepared screed with levels, falls and movement joints resolved first.
Flooring is the largest single surface in most properties and the one where preparation shows fastest.
Hollow-sounding tiles, lippage between large format pieces, cracked grout lines running across a room. Almost all of it comes from the screed underneath rather than from the tile itself.
RSK handles flooring and tiling across Dubai villas and apartments, as part of renovation projects and as standalone work.
The floor is laid on the screed, and the screed is what determines whether the floor works.
The sequence is: lift the existing floor if there is one, assess and prepare the slab, lay or repair screed to the correct level and, in wet areas, the correct fall, allow it to cure, then set out and lay the finish.
Curing is the part that gets compressed. Tiling onto screed that has not cured means moisture trapped underneath, which shows up later as loose tiles, cracked grout and, with timber floors, cupping and lifting.
Setting out matters too. Where a floor starts determines where the awkward cuts land. A properly set out floor puts full tiles where they are seen and cuts where they are not.
For a like-for-like replacement, usually not. In apartments there is one common exception.
Replacing flooring inside a unit is normally the lightest scope, subject to the building's usual rules on access, working hours, protection and waste removal. Lifting an existing tiled floor is noisy work and buildings tend to be strict about when it can happen.
The exception worth knowing about is acoustic requirements. Some Dubai buildings specify an acoustic underlay under hard flooring, to limit impact sound transmitted to the unit below. Where that applies it is in the building's fit out guidelines, and it should be checked before materials are ordered.
Where flooring is part of a wider renovation that includes drainage or wet area work, approval follows the wider project.
Material and area give the baseline. Preparation and format decide the rest:
Screed curing sets the programme, and it cannot be shortened.
Lifting an existing floor is fast. Screed preparation and curing are not, and tiling cannot start until the screed is ready. After laying, grout needs curing before the floor goes into normal use.
Material lead time is the other variable. Specific tiles, particularly imported large format and natural stone, can take time to arrive, and it is worth confirming availability and ordering enough for waste before work starts. Matching a batch later is rarely possible.
Ask whether screed preparation, skirting and waste are inside the price. Those three are the usual gaps between a cheap quote and a complete one.
Tell us the area, the property and what material you are considering. We will check the screed condition and levels on site, and quote with preparation, skirting, waste allowance and movement joints included.