From single-room upgrades to full interior strip-outs — shaped by the building as much as the design, with the building approvals and NOCs that come first handled for you.
An apartment renovation in Dubai is shaped by the building as much as by the design. What you are allowed to change, when trades can work, how materials reach the unit and who signs off are all decided by someone other than you.
That is the real difference from a villa. The finishes are much the same. The constraints are not.
RSK handles apartment and flat renovation across Dubai, from single-room upgrades to full interior strip-outs, including the building approvals and NOCs that come first.
The interior is yours. The structure, the facade and the building services are not.
Where a change sits between these two lists, the building's fit out guidelines decide. Ask for that document before design starts, not after.
In an apartment, the building controls the working day.
None of this is difficult. All of it is slower than working in a villa, and a quote that ignores it is a quote that will slip.
Because a failed bathroom does not damage your floor. It damages someone else's ceiling. That turns a construction defect into a dispute with a neighbour, the owners association and potentially two insurers. It is the single most common reason apartment renovations end badly.
Proper practice means a tanking membrane taken across the floor and up the walls in wet zones, a water test held and recorded before screed goes down, and correct falls to the drain. None of it is visible once tiling is finished, which is exactly why it gets skipped on cheap quotes.
In most buildings yes, and the order matters.
A typical apartment project moves through these in sequence:
Many buildings also require a refundable deposit against damage to common areas, and proof of contractor insurance. Both should be accounted for before you compare quotes, because a contractor who cannot meet the building's requirements cannot start regardless of price.
There is no reliable fixed rate, because scope varies more than size does. Kitchens and bathrooms carry a higher cost per square metre than the rest of the unit, because several trades work in a small area. What moves the number:
Scope and building access set the timeline more than floor area does. Approvals come first and run on the building's and the authority's schedule. The stages:
The two things that stretch apartment timelines most are restricted working hours and late material selections. Both are predictable, and both should be planned for rather than discovered.
Get these in writing before you compare quotes — a contractor who cannot meet the building's requirements cannot start regardless of price.
Send us the building name, unit size and what you want changed. We will check what the building allows, confirm which approvals apply, and issue a written BOQ with scope and exclusions before anything is agreed.