Demolition, blockwork, structural openings, screed and making good — the work that decides what layout is possible, with drawings and permits handled.
Civil works is the part of a project that changes the building itself rather than what is fixed to it.
Walls removed or built, openings formed, levels changed, slabs opened, extensions constructed. It is the work that decides what layout is possible, and the work that most often needs an approval before it can start.
RSK handles civil works across Dubai as part of its renovation and fit out projects, and as standalone packages.
Civil work comes first on site and it is what every other trade builds on.
Demolition, then blockwork or partitions, then plaster, then screed. Only once those are done and dried can MEP second fix, tiling, joinery and painting proceed. A civil package that slips pushes everything behind it.
It is also the messiest and most disruptive stage, which is why access, protection and waste routes matter as much as the construction. In an apartment, how debris leaves the building is a scheduling problem before it is a labour one.
For structural work, yes without exception. For non-structural work, it depends on the property.
Dubai Municipality's building permit procedures cover residential villas, and structural changes and extensions go through that route with approved drawings. Properties in Trakhees or DDA jurisdiction follow their own equivalent processes.
In an apartment, even non-structural partition work normally needs building management approval, because it can affect fire compartmentation, sprinkler coverage and escape routes. Anything touching a structural element in a tower is a different order of approval again.
Villa extensions add a further layer: plot coverage rules and developer consent, both of which vary by community and are confirmed case by case.
Structure and disposal move the number more than area does:
Curing time sets the pace, and it cannot be shortened by adding labour.
Blockwork needs to cure before plaster. Plaster needs to dry before painting. Screed needs to cure before tiling. These are fixed periods, and a programme that ignores them produces cracking and finishes that fail within months.
Where structure is involved, approval turnaround comes first and is the least predictable element of any civil package.
Ask which package making good sits in before signing either quote — it is frequently left out of both.
Tell us the property and what you want changed. We will check the as-built drawings, confirm what is structural, and quote with demolition, disposal, construction and making good listed separately.