Civil contractors Dubai
Home  /  Services  /  Civil Works

Civil Works and Contracting in Dubai

Demolition, blockwork, structural openings, screed and making good — the work that decides what layout is possible, with drawings and permits handled.

Overview

The Work That Changes the Building Itself.

Civil works is the part of a project that changes the building itself rather than what is fixed to it.

Walls removed or built, openings formed, levels changed, slabs opened, extensions constructed. It is the work that decides what layout is possible, and the work that most often needs an approval before it can start.

RSK handles civil works across Dubai as part of its renovation and fit out projects, and as standalone packages.

Civil Works at a Glance
Demolition and strip-out: controlled removal, waste segregation and disposal
Blockwork: new walls, partitions and boundary walls
Drywall partitions: metal stud and board, including acoustic and fire-rated systems
Structural openings: new doorways and openings with lintels and propping
Structural modification: wall removal and support, working to engineer's drawings
Concrete works: slabs, steps, ramps and small structures
Plastering and rendering: internal and external
Screeding: floor levelling and falls
Waterproofing: substrate preparation and membrane application
Extensions: new built-up area within plot coverage rules
Making good: repairing chases, penetrations and damage after other trades
Get a Written BOQ
What It Involves

What Civil Works Involve

Civil work comes first on site and it is what every other trade builds on.

Demolition, then blockwork or partitions, then plaster, then screed. Only once those are done and dried can MEP second fix, tiling, joinery and painting proceed. A civil package that slips pushes everything behind it.

It is also the messiest and most disruptive stage, which is why access, protection and waste routes matter as much as the construction. In an apartment, how debris leaves the building is a scheduling problem before it is a labour one.

Project Types

Types of Civil Works

Non-structural alterations
Removing or building partition walls that carry no load, forming openings in them, and levelling floors. Straightforward, though in an apartment the wall still has to be confirmed non-structural against the as-built drawings.
Structural modification
Removing a load-bearing wall, forming an opening in one, or changing floor levels where the slab is affected. Needs structural drawings from an engineer, propping during works, and authority approval.
Extensions
Adding built-up area to a villa plot. Foundations, structure, roof and envelope, subject to plot coverage rules, developer consent and a building permit.
External and hardscape works
Boundary walls, driveways, steps, ramps and external screeding. Villa only, and affected by season since curing behaves differently in peak summer.
Structure

Structural or Not — and Getting Waste Out

Structural and non-structural: how to tell
You cannot tell by tapping a wall, and guessing is the expensive way to find out. Villas here are typically concrete frame with block infill; towers are concrete frame with a structural core — many internal walls carry no load, but some do, and shear walls in apartments are more common than owners expect.

The answer comes from the as-built drawings held by the developer or building management, checked against site. Where drawings are unavailable, a structural engineer’s assessment is the next step.

Where a load-bearing element is altered, the sequence is fixed: engineer’s drawings → authority approval → temporary propping → opening formed and permanent support installed → propping removed only once support is cured → making good. None of these steps can be skipped, and a contractor who suggests otherwise is telling you something useful about how they work.
Demolition, waste and making good
Demolition is the fast part. Getting the debris out is not.

In villas, waste leaves by skip and the constraint is access and community rules on skip placement. In apartments, debris usually has to travel down a designated service lift at designated times, in bags, through protected corridors. That controls how fast demolition can proceed regardless of how many people are on site.

Making good is the other item worth pinning down. After MEP chases walls and slabs, someone has to repair them. That work sits naturally with the civil package, but it is frequently left out of both the MEP quote and the civil quote, and appears later as a variation. Ask which package it sits in before signing either.
Approvals

Do You Need Approval for Civil Works in Dubai?

For structural work, yes without exception. For non-structural work, it depends on the property.

Dubai Municipality's building permit procedures cover residential villas, and structural changes and extensions go through that route with approved drawings. Properties in Trakhees or DDA jurisdiction follow their own equivalent processes.

In an apartment, even non-structural partition work normally needs building management approval, because it can affect fire compartmentation, sprinkler coverage and escape routes. Anything touching a structural element in a tower is a different order of approval again.

Villa extensions add a further layer: plot coverage rules and developer consent, both of which vary by community and are confirmed case by case.

Cost

How Much Do Civil Works Cost in Dubai?

Structure and disposal move the number more than area does:

Demolition volume
Measured by what comes out, and by how hard it is to remove
Waste disposal
Skip hire in a villa against bagged removal through a service lift
Structural involvement
Engineer's drawings, propping and permanent support
Approvals
Submission drawings, consultant fees and permit costs
Blockwork against drywall
Different material, labour and drying time
Partition specification
Standard drywall against acoustic or fire-rated systems
Plaster and screed area
Straightforward to measure, and a large proportion of most packages
Falls and levels
Creating fall in screed costs more than laying flat
Making good
Repair after MEP chasing, and whose package it sits in
Access
Restricted access in apartments slows every stage
The number that matters
Not a per-square-foot estimate from a website — a written BOQ after a site visit, showing quantities, materials, exclusions and payment milestones.
Usually excluded from cheap quotes
Approvals and drawings, protection of retained finishes, MEP upgrades, waste removal, snagging after handover, and anything described as "subject to site condition".
Timeline

How Long Do Civil Works Take?

Curing time sets the pace, and it cannot be shortened by adding labour.

Blockwork needs to cure before plaster. Plaster needs to dry before painting. Screed needs to cure before tiling. These are fixed periods, and a programme that ignores them produces cracking and finishes that fail within months.

Where structure is involved, approval turnaround comes first and is the least predictable element of any civil package.

Our Work

Recent Civil Work

Civil works Dubai
Structural works Dubai
Construction site Dubai
Avoid These

Mistakes That Cost Money

Assuming a wall is non-structural. Check the as-built drawings. In towers, shear walls are more common than people expect.
Demolishing before approval. Work stopped mid-demolition in an apartment is the worst possible moment for it to happen.
Leaving making good out of both quotes. MEP chases, civil repairs. If neither package names it, you will pay for it as a variation.
Rushing screed curing. Tiling onto uncured screed produces cracked grout and loose tiles a few months later.
Underestimating apartment waste removal. Bagged debris through a booked service lift is far slower than a skip, and it controls the demolition programme.
Checklist

What to Check Before You Start

As-built drawings confirming which walls are structural
Whether a structural engineer is required and who appoints them
Which approvals apply and who submits them
How waste leaves the property and at what times
Whether making good after MEP chasing is inside the civil package
Propping arrangements where structure is altered
Curing periods built into the programme
Protection of retained finishes and common areas
Blockwork or drywall, and the specification of each
Whether external work is scheduled around peak summer

Ask which package making good sits in before signing either quote — it is frequently left out of both.

Why RSK

Why Choose RSK Renovation

Structural status confirmed against as-built drawings rather than assumed
Civil, MEP and finishing under one contractor, so making good does not fall between packages
Curing periods built into the programme rather than compressed
Waste routes and access agreed with the building before demolition begins
Written BOQ with demolition, disposal, construction and making good as separate lines
Related Services

Often Part of a Civil Package

FAQ

Civil Works FAQs

What are civil works in construction?
+
Civil works are the structural and builder's elements of a project: demolition, blockwork and partitions, structural openings, concrete, plastering, screeding and making good. It is the work that changes the building itself, as opposed to the services running through it or the finishes applied to it.
How do I know if a wall is load-bearing?
+
From the as-built drawings held by the developer or building management, checked against what is on site. Tapping a wall or judging by thickness is not reliable. Where drawings are unavailable, a structural engineer's assessment is needed.
Can I remove a wall in my Dubai property?
+
If it is non-structural and the building permits it, usually yes. If it is load-bearing, it needs structural drawings, authority approval, propping during works and permanent support installed. In apartments even non-structural partition work normally needs building management approval.
Do I need a permit for civil works in Dubai?
+
For structural work and extensions, yes. Dubai Municipality's building permit procedures cover residential villas, with Trakhees and DDA operating their own processes in their areas. Non-structural work in an apartment still normally needs building management approval.
Who is responsible for making good after chasing?
+
It should be named explicitly in one of the quotations. It sits naturally with the civil package, but it is often left out of both the MEP and civil quotes and appears later as a variation.
How is demolition waste removed in an apartment?
+
Usually bagged and taken down a designated service lift at booked times, through protected corridors. This is far slower than skip removal in a villa, and it controls how quickly demolition can proceed.
Can you build a villa extension?
+
Where plot coverage rules and developer regulations allow. It requires approved structural drawings, developer consent and a building permit. Community rules vary, so feasibility is confirmed case by case.
WhatsApp Us

Book a Civil Works Survey

Tell us the property and what you want changed. We will check the as-built drawings, confirm what is structural, and quote with demolition, disposal, construction and making good listed separately.

+971 8001 217 info@rskrenovation.ae
Dubai, United Arab Emirates

    Request a Site Visit

    Fill the form and our team will call you back within 24 hours.

    Call Us WhatsApp