Almost everything that decides whether a bathroom renovation was done well is invisible once it is finished — tanking, falls to the drain, pipe routes. We get them right, and put them in writing.
Almost everything that decides whether a bathroom renovation was done well is invisible once it is finished.
Tanking, falls to the drain, pipe routes and how those pipes are fixed all sit under the tiles. Get them wrong and the tiles turn out to be the cheapest part of putting it right.
RSK handles bathroom renovation across Dubai villas and apartments, from single-room refurbishment to full wet-area rebuilds.
A bathroom is a small room with a lot of trades in it. Demolition, drainage, plumbing, electrical, waterproofing, screeding, tiling, joinery, glass and fittings all happen in a space of a few square metres.
That density is why the sequence cannot be rushed and why a bathroom takes longer than its size suggests. Each stage has to be finished, and in some cases tested, before the next can begin.
Electrical safety in wet areas: wet areas are zoned, and the zone decides what fitting is permitted where. Fittings around the shower need appropriate IP ratings, sockets are not permitted inside wet zones, and bathroom circuits should be RCD protected. Heated mirrors, shaver points and underfloor heating all need their own provision at first fix. Not an area to economise in.
If drainage is being altered, almost certainly. If it is a fixture swap, usually not.
Replacing sanitaryware and brassware in place is the lightest scope. Once the layout changes, or the wet area is stripped back and retanked, the position shifts.
In an apartment, altering drainage normally needs building management approval and, depending on the tower, a modification permit through DDA, Trakhees, Dubai Municipality or the free zone authority. Buildings take this seriously because the risk sits with the unit below.
In a villa, a bathroom refurbishment within existing walls is usually straightforward. Adding a bathroom or altering structure moves it into the building permit route.
Bathrooms carry a high cost per square metre because several trades work in a small space. What moves the number:
Curing and testing set the pace, not the trades.
Screed needs time before tiling. Tanking needs its water test before screed. Grout and sealant need time before the room is used. These are fixed periods that cannot be compressed by adding labour, which is why a bathroom takes longer than its size suggests.
Material lead times are the other variable. Specific tiles, sanitaryware and made-to-measure glass can all take time to arrive, so selections should be locked before strip-out begins.
Ask for these as separate lines. A single bathroom price with no breakdown hides whether tanking, a water test and a pressure check are actually included.
Tell us the property and whether the layout is staying. We will check the drainage, the floor depth and the existing waterproofing, then issue a written BOQ with tanking, testing and fittings listed as separate lines.