Interior fit out Dubai
Home  /  Services  /  Interior Fit-Out

Interior Fit Out in Dubai

Offices, retail units and residential spaces taken from empty shell to handover — design coordination, permits, construction and handover under one contract.

Overview

Fit Out Is Not Renovation. Here Is the Difference.

Fit out and renovation get used as if they mean the same thing. They do not.

Renovation changes something that already works. Fit out takes a space handed over empty, or stripped back to empty, and builds everything inside it: partitions, ceilings, floors, services, joinery and finishes.

RSK works as an interior fit out contractor in Dubai across offices, retail units and residential spaces, handling design coordination, permits, construction and handover under one contract.

Fit Out Services at a Glance
Design and drawings: development drawings and authority submission packages
Strip-out: demolition and removal where the space is not bare
Partitions: drywall, glazed systems and acoustic partitions
Ceilings: suspended grid, gypsum and feature ceilings
Electrical: distribution, lighting, small power and containment
HVAC: modification, ducting and diffusers
Plumbing: tea points, washrooms and drainage
Life safety: fire detection and sprinkler modification with Civil Defence coordination
Flooring: tile, carpet, vinyl and raised access
Joinery: reception counters, storage, display units and panelling
Finishes: painting, wall coverings, glazing film and signage
Handover: testing, commissioning and as-built documentation
Get a Written BOQ
What It Involves

What Interior Fit Out Involves

A fit out is a construction project inside an existing building, which means it runs against two sets of rules at once: the authority's, and the landlord's.

The landlord's fit out guidelines set ceiling heights, permitted finishes, service routes, working hours and often which contractors are allowed on site. The authority sets the permit route. Neither is optional, and both constrain the design before design begins.

The construction itself is fairly predictable. Coordination is where fit outs are won or lost.

Project Types

Types of Fit Out

Shell and core
The building is structurally complete with facade, core services brought to the boundary of the unit, and nothing inside. No ceilings, no flooring, no partitions. Everything internal is the occupier's responsibility.
Category A
The landlord's base fit out. Typically raised floors or screeded slab, suspended ceilings, basic lighting, HVAC distribution, fire detection and sprinklers. Usable and compliant but generic, with no partitions and no identity.
Category B
The occupier's fit out. Partitions, meeting rooms, finishes, joinery, branding, feature lighting, kitchens and tea points, furniture, AV and IT containment. This is what most people mean when they say fit out.
Turnkey / design and build
One contractor takes design, permits, construction and handover. Fewer interfaces than appointing a designer, a contractor and an MEP subcontractor separately, and one party accountable when something is late.
Sectors

Sectors We Fit Out

Offices
Workspace planning, partitions, meeting rooms, reception, tea points and branding.
Retail
Shopfronts, display joinery, lighting, flooring and back of house.
Food & Beverage
Front of house finishes, service areas and coordination with kitchen specialists.
Clinics & Salons
Treatment rooms, reception, storage and the finishes those uses require.
Residential
Apartments and villas taken from bare shell to finished home.
Permits

Do You Need a Fit Out Permit in Dubai?

For commercial space, nearly always — and which authority applies depends on the address rather than the building. Dubai is divided between several jurisdictions, and a contractor who works regularly in one is not automatically familiar with another.

Dubai Development Authority
Fit out permit process for its zones, with submission before works and a completion submission afterwards.
Trakhees
Covers areas including Palm Jumeirah, Jebel Ali and the ports and free zone territories.
Dubai Municipality
Building permit procedures covering buildings outside the other jurisdictions.
Free zone authorities
DMCC, DAFZA, JAFZA and others run their own fit out approval processes for units inside their areas.
Dubai Civil Defence
Fire detection, sprinkler modification, emergency lighting and life safety approvals.
DEWA
Electricity and water NOCs, submitted by enrolled contractors and consultants where required.

On top of the authority route, the landlord or building management normally has its own fit out guidelines, an approval process and often an approved contractor list. That document should be the first thing read on any project.

Cost

How Much Does Interior Fit Out Cost in Dubai?

Fit out is priced from drawings, not from floor area alone. What moves the number:

Starting condition
Shell and core against Cat A changes the scope substantially
Area and layout density
More partitions and rooms means more of every trade
MEP scope
Redistributing power, cooling and sprinklers is usually the largest single package
Ceiling type
Standard grid against feature and bulkhead ceilings
Joinery volume
Reception counters, storage and display units priced per linear metre
Finish level
Flooring, glazing and wall finishes vary widely
Life safety works
Sprinkler modification and fire detection carry design and approval cost
Permits and drawings
Authority submissions, consultant fees and as-built documentation
Programme
Compressed programmes mean more labour and out-of-hours working
The number that matters
Not a per-square-foot estimate from a website — a written BOQ after a site visit, showing quantities, materials, exclusions and payment milestones.
Usually excluded from cheap quotes
Approvals and drawings, protection of retained finishes, MEP upgrades, waste removal, snagging after handover, and anything described as "subject to site condition".
Timeline

How Long Does a Fit Out Take?

Permits and long-lead items usually determine the programme, not the construction.

Design and drawings come first, then authority and landlord submissions, then site works. Construction itself is fairly predictable once it starts. What is not predictable is approval turnaround, and what is entirely avoidable is discovering a long-lead item late.

Furniture, made-to-measure glazing, feature lighting and specialist flooring all carry lead times that can exceed the build. Those selections belong at design stage.

Our Work

Recent Fit Out Work

Interior fit out Dubai
Office interior Dubai
Residential fit out Dubai
Avoid These

Mistakes That Cost Money

Designing before reading the landlord's fit out guide. It sets ceiling heights, permitted finishes, service routes, working hours and sometimes the contractor list. Designing first means redrawing.
MEP not coordinated with the ceiling. Ducts, sprinklers, lighting and cable trays all compete for the same void. Resolving that on site rather than on drawings costs time.
Civil Defence submissions left late. Life safety approvals cannot be rushed at the end, and handover depends on them.
Furniture ordered too late. A finished space with no furniture is not a handover.
No as-built drawings. Required for handover and needed by whoever works in the space next. Leaving them out creates a problem you will meet later.
Checklist

What to Check Before You Start

The landlord's fit out guidelines, obtained in writing
Whether the space is shell and core or Cat A
Which authority the address falls under
Whether the landlord operates an approved contractor list
Who prepares and submits the permit drawings
Whether MEP and life safety are inside the quoted scope
Lead times for furniture, glazing and specialist flooring
Permitted working hours and access arrangements
Whether as-built drawings and O and M documentation are included
Payment milestones tied to stages, not dates

Ask for the BOQ split by package. A single figure for a fit out tells you nothing about whether MEP, life safety and as-built documentation are inside it.

Why RSK

Why Choose RSK Renovation

Design, permits, construction and handover under one contract
MEP coordinated on drawings before site works begin
In-house joinery for reception counters, storage and display units
Written BOQ split by package with exclusions stated
As-built drawings and handover documentation issued as standard
Related Services

Related Services

FAQ

Interior Fit Out FAQs

What is the difference between fit out and renovation?
+
Renovation changes a space that already functions. Fit out builds the interior of a space that was handed over empty, or stripped back to empty. Fit out normally includes partitions, ceilings, services distribution and finishes from scratch.
What is the difference between shell and core, Cat A and Cat B?
+
Shell and core is a structurally complete building with services only to the unit boundary and nothing inside. Cat A is the landlord's base fit out with floors, ceilings, basic lighting and HVAC distribution. Cat B is the occupier's fit out: partitions, finishes, joinery, branding and everything that makes the space specific to the business.
Do I need a fit out permit in Dubai?
+
For commercial space, almost always. Which authority applies depends on where the building sits: DDA, Trakhees, Dubai Municipality or a free zone authority. Civil Defence approval applies where fire and life safety systems are affected. The landlord will usually have its own approval process on top.
How much does it cost to fit out an office in Dubai?
+
It depends on the starting condition, layout density, MEP scope, ceiling type, joinery volume and finish level. A shell and core office costs substantially more to fit out than a Cat A space. Pricing comes from drawings, not from floor area alone.
Can you work with our own designer?
+
Yes. We can build to supplied drawings, or take design and build together as one contract.
Do you handle residential fit out as well as commercial?
+
Yes. Apartments and villas handed over as bare shell are fitted out the same way, though the approvals route and the finishes differ.
Who is responsible for the permits?
+
Permit coordination is part of the project scope. The exact division of responsibility is confirmed in the contract.
WhatsApp Us

Request a Fit Out Proposal

Send us the location, the area and the current condition of the space, along with the landlord's fit out guidelines if you have them. We will confirm which permits apply and issue a BOQ split by package.

+971 8001 217 info@rskrenovation.ae
Dubai, United Arab Emirates

    Request a Site Visit

    Fill the form and our team will call you back within 24 hours.

    Call Us WhatsApp